Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK [sub-heading only] (8)
- (-) CROSS Newsletter (11)
- CROSS Safety Report (11)
- News [sub-heading only] (2)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Offshore tower failure
The top two thirds of a three part off-shore lattice mast failed due to problems with some of the connection bolts.
1 January 2014
CROSS Safety Report
Report ID: 358
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
Fibrous plaster ceiling features
This recent report of a serious concern about an old fibrous plaster ceiling has similarities to the Apollo Theatre ceiling collapse in London in December 2013.
1 July 2015
CROSS Safety Report
Report ID: 518
Region: CROSS-UK
Importance of bearings
A reporter is concerned that the long-term characteristics and behaviour of bearings are often underestimated.
1 April 2016
CROSS Safety Report
Report ID: 387
Region: CROSS-UK
Partial roof collapse at shopping centre
There was a recent partial roof collapse at a shopping centre which was, says the reporter, built in the early 1970s in a form which may have been used extensively throughout the UK during this period and possibly beyond.
1 October 2013
CROSS Safety Report
Report ID: 395
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Roof collapse at primary school
Blocked drainage outlets likely lead to the build-up of water on a school roof which collapsed.
1 July 2020
CROSS Safety Report
Report ID: 958
Region: CROSS-UK
Lack of lateral stability in steel frame
Concerns were raised after the steel frame of a building was found to have a lack of horizontal and vertical bracing.
1 July 2016
CROSS Safety Report
Report ID: 540
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.