Safety information search results
Filter your results
Building or structure type
- Bridges (4)
- Buildings
(54)
- Agricultural buildings (2)
- Commercial (7)
- Education, science & art buildings (4)
- Health care (2)
- Industrial buildings (2)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (2)
- Residential (17)
- Stadiums (2)
- Storage buildings (1)
- Tall buildings (3)
- Theatres & other entertainment buildings (3)
- Transport buildings (1)
- Car parks (1)
- Flats & apartments (3)
- Floating structures (1)
- Houses (4)
- Marine structures (1)
- Masts & towers (4)
- Railways (1)
- Retaining structures (3)
- Temporary structures (7)
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (34)
- Excavation (1)
- Extension project (7)
- New build (11)
- Refurbishment (6)
- Remediation project (3)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (4)
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (45)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (21)
- CROSS Safety Report (80)
- CROSS Topic Paper (1)
- News [sub-heading only] (8)
CROSS regions
Concrete grade confusion in software
A reporter noticed that the design calculation report generated by a proprietary software package called for ‘concrete characteristic strength = 45N/mm2’, but did not confirm whether this refers to the cylinder or cube strength.
1 April 2019
CROSS Safety Report
Report ID: 788
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Wind loads acting on timber frame walls for designs to BS 5268-6
A reporter says that the masonry shielding factors in BS 5268-6 (K100 and K200) were substantially reduced when PD 6693-1 for designs to EC5 was produced.
1 April 2019
CROSS Safety Report
Report ID: 624
Region: CROSS-UK
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Reflective thinking
Reflective thinking is a constant drive to ask questions and to make appropriate responses to them. It is characterised by a healthy scepticism about all inputs to processes, about the processes themselves and about the outcomes from processes.
1 December 2016
CROSS Topic Paper
Region: CROSS-UK
Alteration of calculations on constructed loft conversion
A reporter says they were pressurised to adjust structural design calculations to pass a building control check.
1 July 2016
CROSS Safety Report
Report ID: 580
Region: CROSS-UK
Roof constructed without structural input
A reporter wants to highlight the problem of builders working off plans provided by an architect or surveyor and assuming that section sizes shown on their drawings are structurally adequate.
1 January 2016
CROSS Safety Report
Report ID: 515
Region: CROSS-UK
Incorrectly designed safety system
A reporter raises concerns about the way in which the structure for a safety system had been modelled using an inappropriate software package.
1 January 2016
CROSS Safety Report
Report ID: 527
Region: CROSS-UK
Failure to check designs produced by software
Concerns were raised about a proprietary design software after a building control officer noticed a regular error appearing while checking calculations provided to them.
1 January 2016
CROSS Safety Report
Report ID: 538
Region: CROSS-UK
Understanding the difference between analysis and design
A reporter is becoming increasingly concerned about design practice and correct understanding of the difference between analysis and design and the linking of the two.
1 April 2015
CROSS Safety Report
Report ID: 372
Region: CROSS-UK