Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK [sub-heading only] (14)
- CROSS Newsletter (10)
- CROSS Safety Alert (1)
- CROSS Safety Report (22)
- News [sub-heading only] (4)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Cladding - the case for improving inspection
A review of SCOSS reports from 1977 - 2000 pointed up the problems relating to design and inspection of cladding, and the difficulties of changing bad and sometimes unsafe practice.
1 May 2000
CROSS Safety Alert
Region: CROSS-UK
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
Multi-storey car parks - structural condition concerns
A reporter raises concerns about the structural condition of a number of car parks that they have worked on as remediation projects.
1 April 2012
CROSS Safety Report
Report ID: 265
Region: CROSS-UK
School roof timber truss collapse
A gym/assembly hall roof to a school collapsed suddenly and without warning overnight when fortunately the building was unoccupied.
1 January 2012
CROSS Safety Report
Report ID: 249
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.