Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (31)
- CROSS Newsletter (20)
- CROSS Safety Report (38)
- News [sub-heading only] (4)
CROSS regions
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Workmanship in domestic buildings
A reporter has raised concerns after discovering a steel beam on site had its web cut away at the support without approval from the design engineer.
14 October 2020
CROSS Safety Report
Report ID: 971
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Wall tie design between masonry panels and timber frames
This report discusses the potential for failure of timber frame wall ties between masonry and timber in moderate to high wind conditions.
1 January 2020
CROSS Safety Report
Report ID: 832
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Repeating the same design mistakes
A correspondent who investigates engineering failures has shared common errors which engineers keep repeating.
1 October 2019
CROSS Safety Report
Report ID: 858
Region: CROSS-UK
The risk of swapping insulation behind cladding
A reporter is concerned that insulation behind cladding is being swapped without a full appreciation of the implications.
1 July 2019
CROSS Safety Report
Report ID: 784
Region: CROSS-UK
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.