Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (40)
- CROSS Newsletter (40)
- CROSS Safety Alert (1)
- CROSS Safety Report (50)
- CROSS Topic Paper (1)
- News [sub-heading only] (13)
CROSS regions
Concerns over robustness of some 20 year old buildings
Concerns about the robustness of several two-storey buildings dating from the early 2000s.
6 June 2022
CROSS Safety Report
Report ID: 1051
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Safety issues when adding PV panels to existing roofs
A reporter raises concerns over the lack of structural engineering knowledge and dangerous assumptions, that they have seen, in assessments for the installation of photovoltaic (PV) panels for a number of buildings.
13 December 2021
CROSS Safety Report
Report ID: 1015
Region: CROSS-UK
Professional indemnity insurance issues raise safety concerns
Several reporters have raised concerns in relation to significant cost increases and the introduction of new restrictions on professional indemnity insurance (PII) policies.
13 August 2021
CROSS Safety Report
Report ID: 1022
Region: CROSS-UK
Specification issue with steel hollow sections
A reporter raises concerns after their structural engineer had failed to specify the steel grade used in the design for hollow sections on two projects.
30 July 2021
CROSS Safety Report
Report ID: 1006
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Share your knowledge
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.
Suspended ceiling replacement in high rise block
A reporter was involved in replacing a suspended ceiling after a few loose panels had fallen, resulting in a minor injury in one case.
1 April 2020
CROSS Safety Report
Report ID: 911
Region: CROSS-UK
Crane outrigger loads underestimated due to misuse of software
A reporter is concerned about how the misuse of software can lead to incorrect outrigger loads being used in the design of foundations for crane outriggers.
1 April 2020
CROSS Safety Report
Report ID: 915
Region: CROSS-UK
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK
Response to report 614 on missing columns from drawings
A reporter shares their views on how to implement robust checking systems for Building Information Modelling (BIM) models.
1 January 2020
CROSS Safety Report
Report ID: 645
Region: CROSS-UK