Safety information search results
Filter your results
Materials
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (7)
- CROSS Safety Report (10)
- News [sub-heading only] (2)
CROSS regions
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Failure of existing long-span wood roof truss following installation of new roof-top HVAC units
Failure of an existing long-span wood roof truss following installation of new roof-top Heating, Ventilating, and Air Conditioning (HVAC) units offers lessons in the special challenges of renovations to existing buildings.
1 September 2020
CROSS Safety Report
Report ID: 949
Region: CROSS-US
Wind loads acting on timber frame walls for designs to BS 5268-6
A reporter says that the masonry shielding factors in BS 5268-6 (K100 and K200) were substantially reduced when PD 6693-1 for designs to EC5 was produced.
1 April 2019
CROSS Safety Report
Report ID: 624
Region: CROSS-UK
PV panels and structural adequacy of roofs
A reporter raises concerns over the structural adequacy of existing roofs to accommodate PV panels.
1 October 2016
CROSS Safety Report
Report ID: 589
Region: CROSS-UK
Swimming pool ceiling partial collapse
Part of a ceiling above a swimming pool collapsed, injuring four people.
1 April 2015
CROSS Safety Report
Report ID: 426
Region: CROSS-UK
School roof timber truss collapse
A gym/assembly hall roof to a school collapsed suddenly and without warning overnight when fortunately the building was unoccupied.
1 January 2012
CROSS Safety Report
Report ID: 249
Region: CROSS-UK
Share your knowledge
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.
Reduced partition loads on proprietary joists
A reporter believes that a number of proprietary joist manufacturers are using a reduced partition allowance for the engineered joist design.
1 July 2008
CROSS Safety Report
Report ID: 108
Region: CROSS-UK
Site hoardings blow down
Investigations into timber hoarding failures by the reporter’s firm indicated that the majority of site hoardings are erected with no design whatsoever.
1 October 2007
CROSS Safety Report
Report ID: 83
Region: CROSS-UK
Low pitched metal sheet roofs
A reporter is concerned about low pitch metal sheet roofing attached to trussed rafters.
1 April 2007
CROSS Safety Report
Report ID: 66
Region: CROSS-UK
Concerns over structural design submissions
Concern was expressed about the standard of structural design submissions presented to local authorities.
1 November 2005
CROSS Safety Report
Report ID: 14
Region: CROSS-UK