Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
- Balconies (2)
- Balustrades (2)
- Basements (1)
- Beams (19)
- Bracing (5)
- Ceilings (1)
- Cladding (3)
- Columns (7)
- Fasteners & connections (26)
- Fire protection (2)
- Foundations (2)
- Insulation (1)
- Light gauge steel framing (3)
- Padstones (2)
- Parapets (3)
- PV panels (1)
- Roofs (3)
- Slabs (2)
- Trusses (1)
- Walls (2)
- Wall ties (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (34)
- CROSS Newsletter (28)
- CROSS Safety Report (55)
- News [sub-heading only] (12)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Excessive deflection of spliced steel beam
A long-span primary steel beam deflects excessively at its splice during concreting of the floor slab.
30 August 2022
CROSS Safety Report
Report ID: 1111
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Metal cladding panels fail and fall to ground
During high winds, a number of metal cladding panels failed and fell to the ground from a tall commercial building in a major UK city.
26 August 2022
CROSS Safety Report
Report ID: 1134
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Wrong length blind bolts lead to unsafe bridge structure
Bridge strengthening being carried out using blind bolts left a structure in an unsafe condition with traffic loading on it.
20 February 2023
CROSS Safety Report
Report ID: 1185
Region: CROSS-UK
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.