Safety information search results
Filter your results
Building or structure type
- Bridges (30)
- Buildings
(115)
- Agricultural buildings (6)
- Commercial (10)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (5)
- Health care (1)
- Industrial buildings (7)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (6)
- Recreational buildings (3)
- Residential (26)
- Stadiums (5)
- Storage buildings (6)
- Tall buildings (4)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Car parks (5)
- Flats & apartments (10)
- Houses (6)
- Masts & towers (7)
- Railways (6)
- Retaining structures (6)
- Roads (1)
- Temporary structures (11)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (5)
- Design: quality management (20)
- Design calculations (27)
- Design conceptualisation (11)
- Design detailing (55)
- Design drawings (13)
- Design loads (27)
- Design software (10)
- Dynamics (6)
- Fire safety design (5)
- Resilience (7)
- Robustness (19)
- Structural design (75)
- Sustainability (1)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (9)
- Assessment project [sub-heading only] (5)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (79)
- Demolition project (2)
- Excavation (3)
- Extension project (7)
- New build (46)
- Refurbishment (6)
- Remediation project (6)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (8)
Method of construction
Elements & systems
- Balconies (7)
- Balustrades (11)
- Basements (1)
- Beams (51)
- Bracing (13)
- Cables (4)
- Canopies (2)
- Ceilings (2)
- Cladding (10)
- Columns (27)
- Fasteners & connections (88)
- Fire protection (4)
- Foundations (8)
- Insulation (2)
- Light gauge steel framing (10)
- Lintels (2)
- Padstones (4)
- Parapets (4)
- PV panels (1)
- Roofs (17)
- Shear walls (1)
- Signs (1)
- Slabs (5)
- Tendons (1)
- Trusses (4)
- Walls (15)
- Wall ties (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (6)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 4 (6)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (3)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 23 (4)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (4)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (4)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (4)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (6)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (121)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (87)
- CROSS Safety Alert (4)
- CROSS Safety Report (210)
- CROSS Topic Paper (2)
- News [sub-heading only] (30)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Corrosion concerns on a pedestrian bridge
A reporter is concerned about a pedestrian bridge that may have reduced load capacity due to corrosion at the root of cantilever supports.
17 February 2023
CROSS Safety Report
Report ID: 1161
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Fatigue failure of bridge cross-girder
During a planned examination of a bridge, a cross-girder was found to have failed via fatigue.
23 May 2022
CROSS Safety Report
Report ID: 743
Region: CROSS-UK
Corrosion of main girder beam on bridge supporting rail lines
A hole was found in the central main girder on a bridge supporting rail line during inspection works.
23 May 2022
CROSS Safety Report
Report ID: 745
Region: CROSS-UK
Corrosion of bridge girder beams
Severe corrosion of bridge girder beams was found during intrusive inspections.
23 May 2022
CROSS Safety Report
Report ID: 772
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Failures of cold formed steel floor systems during construction
This report describes numerous collapses during construction of cold formed steel floor systems caused by lack of bracing/fastening and overloading of an incomplete structure.
10 May 2021
CROSS Safety Report
Report ID: 997
Region: CROSS-US
Design of internal partitions for horizontal loads
This report draws attention to the requirement for internal partitions to be designed for horizontal loads from wind and seismic effects in accordance with Section B of the Australian National Construction Code (NCC).
30 April 2021
CROSS Safety Report
Report ID: 1000
Region: CROSS-AUS
Potentially unsafe software design for steel beams
A steel beam design package makes simplified assumptions that may carry risks if not used by competent engineers.
30 July 2021
CROSS Safety Report
Report ID: 1003
Region: CROSS-UK