Safety information search results
Filter your results
Building or structure type
- Buildings
(51)
- Commercial (4)
- Education, science & art buildings (7)
- Health care (1)
- Higher-risk buildings (2)
- Industrial buildings (2)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (2)
- Residential (20)
- Stadiums (1)
- Storage buildings (1)
- Tall buildings (2)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Flats & apartments (5)
- Houses (7)
- Masts & towers (1)
- Railways (1)
- Temporary structures (3)
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (7)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (18)
- Maintenance project (1)
- New build (5)
- Refurbishment (2)
- Remediation project (5)
- Repair project (1)
- Strengthening project (3)
- Structural assessment (4)
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK [sub-heading only] (30)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (5)
- CROSS Newsletter (10)
- CROSS Safety Alert (2)
- CROSS Safety Report (53)
- CROSS Topic Paper (2)
- News [sub-heading only] (12)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Structural misunderstanding leads to historic church tower nearly being demolished
A historic church stands at the center of a charming town. Highlighted among many striking features is the iconic 170-foot (52m) bell tower, which looms over the town. For decades, the tower has become the centerpiece for cultural events in addition to being the original community center of worship.
2 May 2023
CROSS Safety Report
Report ID: 1013
Region: CROSS-US
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Roof collapse at a social club
This is a report about a roof collapse that occurred, in about 1985, because only half as many parallel faced timber roof trusses were installed as there should have been.
30 June 2022
CROSS Safety Report
Report ID: 942
Region: CROSS-UK
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK
Failure of beams in listed building
Conversion and refurbishment work on a listed building led to structural failures of beams and subsequent difficulties in resolving safety matters between the various agencies involved.
30 July 2021
CROSS Safety Report
Report ID: 1016
Region: CROSS-UK
Inappropriate material storage causes collapse of ceiling of a truck dock mezzanine
This report describes the collapse of an overloaded framed ceiling.
10 May 2021
CROSS Safety Report
Report ID: 983
Region: CROSS-US
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.