Safety information search results
Filter your results
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (2)
- Assessment project [sub-heading only] (10)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (8)
- Extension project (1)
- New build (3)
- Refurbishment (3)
- Remediation project (5)
- Repair project (3)
- Strengthening project (1)
- Structural assessment (11)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Content type
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (37)
- CROSS Newsletter (23)
- CROSS Safety Alert (1)
- CROSS Safety Report (59)
- CROSS Topic Paper (2)
- News [sub-heading only] (6)
- Safety information [sub-heading only] (1)
CROSS regions
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Use of temporary barriers to control access to hazards
This report highlights the risks associated with the use of temporary barriers to control access to unsafe workplaces. It discusses the issues when scaffolding is used as a barrier, and that this should only be considered for use as a short-term temporary barrier.
25 November 2021
CROSS Safety Report
Report ID: 980
Region: CROSS-AUS
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Domestic canopy degradation
A front entrance canopy to a domestic dwelling had to be temporarily propped following movement of the canopy.
10 February 2023
CROSS Safety Report
Report ID: 853
Region: CROSS-UK
Mesh flooring safety issues
A reporter has recently witnessed a number of safety issues with open grid mesh flooring.
10 February 2023
CROSS Safety Report
Report ID: 913
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Fatality from free standing wall collapse
A report was received from a local authority about a boundary wall to the front garden of a domestic property that collapsed suddenly resulting in the death of a child who was passing.
1 January 2008
CROSS Safety Report
Report ID: 59
Region: CROSS-UK
Precast concrete planks - durability and potential safety concerns
A reporter raises concerns over the recent collapses of precast concrete floor units that are installed throughout the UK.
1 April 2007
CROSS Safety Report
Report ID: 77
Region: CROSS-UK
Facade failure
Large pieces of granite fell without warning from a second floor opening.
1 February 2007
CROSS Safety Report
Report ID: 63
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK