Safety information search results
Filter your results
Building or structure type
- Bridges (11)
- Buildings
(90)
- Agricultural buildings (1)
- Commercial (11)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (3)
- Residential (24)
- Storage buildings (1)
- Tall buildings (5)
- Theatres & other entertainment buildings (4)
- Transport buildings (1)
- Car parks (4)
- Flats & apartments (4)
- Hotels & hostels (1)
- Houses (14)
- Masts & towers (2)
- Railways (1)
- Retaining structures (7)
- Roads (2)
- Sewers (1)
- Temporary structures (9)
Materials
Project or lifecycle stage
Design
- BIM (1)
- Computational design (2)
- Design: quality management (22)
- Design calculations (25)
- Design conceptualisation (4)
- Design detailing (44)
- Design drawings (16)
- Design loads (35)
- Design software (8)
- Dynamics (2)
- Fire safety design (8)
- Resilience (2)
- Robustness (11)
- Structural design (45)
- Sustainability (2)
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (5)
- Construction project [sub-heading only] (51)
- Demolition project (1)
- Excavation (3)
- Extension project (5)
- New build (36)
- Refurbishment (4)
- Remediation project (8)
- Repair project (2)
- Strengthening project (2)
- Structural assessment (6)
- Underpinning project (1)
Method of construction
Structural form
Elements & systems
- Arch (1)
- Balconies (1)
- Balustrades (5)
- Basements (3)
- Beams (27)
- Bracing (8)
- Ceilings (3)
- Cladding (12)
- Columns (12)
- Fasteners & connections (42)
- Fire protection (6)
- Foundations (7)
- Insulation (3)
- Light gauge steel framing (2)
- Padstones (2)
- Parapets (3)
- Roofs (24)
- Signs (1)
- Slabs (16)
- Trusses (7)
- Walls (20)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (5)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK [sub-heading only] (100)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (4)
- CROSS Newsletter (114)
- CROSS Safety Alert (1)
- CROSS Safety Report (148)
- CROSS Topic Paper (1)
- News [sub-heading only] (29)
CROSS regions
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Tower crane base designs
A reporter’s firm has been involved in the design and checking of numerous tower crane bases and have come across many examples where the supplier of the tower crane has supplied incorrect loadings. These incorrect loadings could have led to crane failures had the errors not been spotted.
7 June 2022
CROSS Safety Report
Report ID: 1093
Region: CROSS-UK
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Share your knowledge
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Basement excavation under a semi-detached house causes collapse
Basement excavation under a semi-detached house causes a collapse.
10 March 2022
CROSS Safety Report
Report ID: 1063
Region: CROSS-UK
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK