Safety information search results
Filter your results
Building or structure type
- Bridges (9)
- Buildings
(52)
- Agricultural buildings (1)
- Commercial (5)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (1)
- Higher-risk buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (2)
- Residential (14)
- Storage buildings (1)
- Tall buildings (3)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Car parks (1)
- Flats & apartments (3)
- Hotels & hostels (1)
- Houses (7)
- Masts & towers (1)
- Railways (2)
- Reservoirs & dams (1)
- Retaining structures (3)
- Roads (1)
- Sewers (2)
- Temporary structures (3)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (10)
- Conservation & restoration project (1)
- (-) Construction project [sub-heading only] (70)
- Demolition project (1)
- Excavation (3)
- Extension project (4)
- Groundworks project (1)
- Maintenance project (1)
- New build (33)
- Refurbishment (6)
- Remediation project (10)
- Repair project (4)
- Strengthening project (3)
- Structural assessment (2)
- Underpinning project (1)
Method of construction
Structural form
Elements & systems
- Arch (1)
- Balconies (1)
- Balustrades (3)
- Basements (1)
- Beams (15)
- Bracing (5)
- Ceilings (1)
- Cladding (9)
- Columns (9)
- Fasteners & connections (28)
- Fire protection (2)
- Foundations (6)
- Insulation (3)
- Light gauge steel framing (2)
- Padstones (1)
- Parapets (2)
- PV panels (1)
- Roofs (8)
- Sandwich panels (1)
- Signs (1)
- Slabs (9)
- Trusses (3)
- Walls (9)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Theme pages
Content type
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (38)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (27)
- CROSS Safety Report (70)
- News [sub-heading only] (11)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Metal cladding panels fail and fall to ground
During high winds, a number of metal cladding panels failed and fell to the ground from a tall commercial building in a major UK city.
26 August 2022
CROSS Safety Report
Report ID: 1134
Region: CROSS-UK
Toughened glass failures
The number of failures of heat-soaked toughened glass leads to a finding that the glass produced by some processors has not been properly heat-soaked and is therefore much more likely to shatter in use.
17 November 2022
CROSS Safety Report
Report ID: 1135
Region: CROSS-UK
Cladding failure in strong winds
A reporter writes with concerns about a repeat failure of building cladding, in severe but not exceptional winds, that saw panels fall to the public street below.
17 February 2023
CROSS Safety Report
Report ID: 1172
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.