Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (5)
- CROSS Newsletter (1)
- CROSS Safety Report (9)
- News [sub-heading only] (1)
CROSS regions
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Collapse of a reinforcing cage
The reinforcing cage to a blade pier for an overpass bridge collapsed without warning when nearing completion.
1 August 2020
CROSS Safety Report
Report ID: 941
Region: CROSS-AUS
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Collapsed scaffolding
A reporter highlights how, following modest levels of snow fall in the winter, scaffolding erected in order to support a temporary roof collapsed inwards.
1 October 2019
CROSS Safety Report
Report ID: 730
Region: CROSS-UK
Collapse of unsupported deep trench excavation
A worker was trapped within a partially collapsed excavation which was unsupported and not suitably benched.
1 October 2019
CROSS Safety Report
Report ID: 675
Region: CROSS-UK
Falsework support to a bridge – a near miss
This report follows the near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
1 October 2012
CROSS Safety Report
Report ID: 333
Region: CROSS-UK
Wind on internal masonry walls during construction
There has been a generic report from a contractor about internal masonry walls during construction following his experiences of failures.
1 October 2007
CROSS Safety Report
Report ID: 82
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.