Safety information search results
Filter your results
Building or structure type
- Bridges (65)
- Buildings
(471)
- Agricultural buildings (9)
- Commercial (41)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (31)
- Health care (10)
- Higher-risk buildings (4)
- Industrial buildings (18)
- Laboratory buildings (1)
- LPS buildings (3)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (8)
- Residential (120)
- Stadiums (6)
- Storage buildings (10)
- Tall buildings (20)
- Theatres & other entertainment buildings (10)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Car parks (18)
- Flats & apartments (41)
- Floating structures (1)
- Freestanding walls (5)
- Hotels & hostels (7)
- Houses (51)
- Marine structures (3)
- Masts & towers (19)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (41)
- Roads (14)
- Sewers (5)
- Temporary structures (44)
- Tunnels (4)
Building height
- 5m or higher, but lower than 11m (19)
- 5m or higher, but lower than 12m (4)
- 11m or higher, but lower than 18m (11)
- 18m or higher, but lower than 30m (9)
- 30m or higher (5)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK [sub-heading only] (21)
- CROSS-US [sub-heading only] (2)
- Lower than 5m (2)
- Lower than 5m (2)
Materials
Project or lifecycle stage
Design
- BIM (6)
- Computational design (14)
- Design: quality management (72)
- Design calculations (80)
- Design conceptualisation (29)
- Design detailing (112)
- Design drawings (37)
- Design loads (117)
- Design software (34)
- Dynamics (12)
- Fire safety design (15)
- Resilience (24)
- Robustness (62)
- Structural design (147)
- Sustainability (9)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (43)
- Assessment project [sub-heading only] (20)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (262)
- Demolition project (16)
- Excavation (17)
- Extension project (21)
- Fire safety assessment (1)
- Groundworks project (3)
- Maintenance project (5)
- New build (115)
- Refurbishment (20)
- Remediation project (23)
- Repair project (10)
- Strengthening project (11)
- Structural assessment (29)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (16)
- Balustrades (25)
- Basements (13)
- Beams (86)
- Bracing (23)
- Cables (4)
- Canopies (8)
- Ceilings (25)
- Cladding (38)
- Columns (50)
- Fasteners & connections (176)
- Fences (1)
- Fire protection (11)
- Foundations (44)
- Insulation (8)
- Light gauge steel framing (10)
- Lintels (4)
- Padstones (5)
- Parapets (12)
- PV panels (4)
- Roofs (80)
- Sandwich panels (3)
- Shear walls (5)
- Signs (5)
- Slabs (60)
- Tendons (2)
- Trusses (11)
- Wall head restraints (3)
- Walls (115)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (13)
- CROSS-UK [sub-heading only]
(55)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (2)
- Health and Safety Executive (HSE) (18)
- Local Authority Building Control (LABC) (23)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
- CROSS-US [sub-heading only] (1)
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (19)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (5)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (7)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (6)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (8)
- CROSS-UK Newsletter 67 (8)
- CROSS-UK Newsletter 68 (6)
- CROSS-UK [sub-heading only] (385)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (4)
- CROSS-US [sub-heading only] (10)
- CROSS Newsletter (224)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (718)
- CROSS Theme Page (2)
- CROSS Topic Paper (24)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (4)
- Safety information [sub-heading only] (5)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Partial collapse of a shopping mall roof under drifting snow
Partial collapse of a shopping mall roof under drifting snow caused by lack of building code provisions for drifting snow and poor fabrication of open web steel joists.
2 May 2023
CROSS Safety Report
Report ID: 1009
Region: CROSS-US
Dangerous defects in curtain wall glazing
This report concerns a 5m high vertical glazing system in which the fixings for a panel failed after only four years because of a lack of co-ordination between designers and contractors.
6 April 2023
CROSS Safety Report
Report ID: 762
Region: CROSS-UK
Architectural panel acting as barrier
A reporter came across a scenario on site where an architectural decorative panel was acting as a barrier during the construction stage without being designed to act as one.
6 April 2023
CROSS Safety Report
Report ID: 927
Region: CROSS-UK
Change in use results in masonry wall failure
A room with walls of traditional cavity and single skin masonry was lined with plywood and used for storage of wood chips. No thought was given to the lateral pressure on the walls which eventually failed.
6 April 2023
CROSS Safety Report
Report ID: 884
Region: CROSS-UK
Incorrect fabrication of balustrade connection
A reporter describes how threaded bars were incorrectly used for a balustrade fixing instead of bolts which led to failure of the connection.
6 April 2023
CROSS Safety Report
Report ID: 851
Region: CROSS-UK
Private Building Control data protection use
A reporter needed details of a domestic extension from a local authority who said that an application had been made for the original work by a private company, but under the Data Protection Act they could not release any drawings or documentation.
6 April 2023
CROSS Safety Report
Report ID: 825
Region: CROSS-UK
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
The misuse of standard details and notes on structural drawings
This report draws attention to the excessive and incorrect use of standard details and notes on structural drawings, as well as the assumption that the builder/contractor will somehow work out the designer's intention of these on site. Inadequate or conflicting design and documentation can potentially lead to failures.
30 March 2023
CROSS Safety Report
Report ID: 1133
Region: CROSS-AUS
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS