Safety information search results
Filter your results
Building or structure type
- Bridges (5)
- Buildings
(81)
- Agricultural buildings (6)
- Commercial (8)
- Education, science & art buildings (7)
- Health care (2)
- Industrial buildings (4)
- Public, religious & civic buildings (2)
- Recreational buildings (2)
- Residential (18)
- Stadiums (2)
- Storage buildings (6)
- Tall buildings (9)
- Theatres & other entertainment buildings (1)
- Transport buildings (3)
- Buried pipes & culverts (3)
- Car parks (5)
- Flats & apartments (5)
- Freestanding walls (2)
- Hotels & hostels (2)
- Houses (8)
- Railways (2)
- Reservoirs & dams (1)
- Retaining structures (6)
- Roads (3)
- Sewers (2)
- Temporary structures (10)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (24)
- Excavation (2)
- Extension project (2)
- Groundworks project (2)
- Maintenance project (1)
- New build (7)
- Refurbishment (2)
- Remediation project (3)
- Repair project (2)
- Strengthening project (2)
- Structural assessment (2)
Method of construction
Structural form
Elements & systems
- ACM cladding (1)
- Arch (1)
- Balconies (2)
- Balustrades (4)
- Beams (4)
- Bracing (2)
- Cables (1)
- Canopies (1)
- Ceilings (4)
- Cladding (12)
- Columns (4)
- Fasteners & connections (29)
- Foundations (3)
- Insulation (1)
- Light gauge steel framing (3)
- Padstones (1)
- Parapets (7)
- PV panels (1)
- Roofs (29)
- Sandwich panels (1)
- Shear walls (1)
- Signs (2)
- Slabs (3)
- Trusses (3)
- Wall head restraints (2)
- Walls (17)
- Wall ties (4)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (3)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS Newsletter 8 (1)
- CROSS-AUS [sub-heading only] (6)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (4)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (55)
- CROSS-US Newsletter 1 (4)
- CROSS-US Newsletter 2 (3)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (6)
- CROSS Newsletter (27)
- CROSS Safety Alert (9)
- CROSS Safety Report (107)
- CROSS Topic Paper (1)
- News [sub-heading only] (7)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Inadequate design and quality assurance on a mandatory seismic retrofit project
A tenant's structural engineer discovers widespread design and related quality problems on a mandatory seismic retrofit project.
1 September 2020
CROSS Safety Report
Report ID: 986
Region: CROSS-US
Metal panel blown off roof
During some exceptionally gusty winds, a metal roof panel was blown off an office building roof onto a railway station roof below.
1 April 2016
CROSS Safety Report
Report ID: 537
Region: CROSS-UK
Metal shed blown off roof
During some very gusty winds, a metal shed which had been placed on a ninth floor terrace, was blown down to the street below.
1 April 2016
CROSS Safety Report
Report ID: 536
Region: CROSS-UK
Local wind effects at high level
A reporter shares their experience on the wind speeds they encountered when carrying out high level works on a city centre building.
1 July 2016
CROSS Safety Report
Report ID: 548
Region: CROSS-UK
Wind loads acting on timber frame walls for designs to BS 5268-6
A reporter says that the masonry shielding factors in BS 5268-6 (K100 and K200) were substantially reduced when PD 6693-1 for designs to EC5 was produced.
1 April 2019
CROSS Safety Report
Report ID: 624
Region: CROSS-UK
Wind damage due to unplanned cladding
A reporter describes how some of the uprights of the fencing around local tennis courts were markedly out of vertical.
1 April 2017
CROSS Safety Report
Report ID: 604
Region: CROSS-UK
Wind damage to roof with PV panels
A reporter describes how during a heavy storm a big area of roof tiles that were adjacent to PV panels blew down.
1 October 2016
CROSS Safety Report
Report ID: 590
Region: CROSS-UK
Plasterwork ceiling partial collapse at railway station
A section of a ceiling cornice, plasterboard panel and lighting collapsed at a railway station landing on the floor.
1 October 2016
CROSS Safety Report
Report ID: 587
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK