Concerns over robustness of some 20 year old buildings
Overview
A correspondent is concerned about the robustness of several two-storey buildings with which their design team were involved in the early 2000s. It was a stressful time with a high workload and there was pressure on the design team, some of whose members were inexperienced.
Key Learning Outcomes
Owners:
- Ensure design teams are allocated sufficient resource and time
Architects and designers:
- Collaborate closely with structural engineers and understand their recommendations
Civil and structural engineers:
- Do not succumb to time and financial pressures that compromise design principles
- Are encouraged to seek a review of their work by a competent person
- Do not allow yourself to be compromised on quality
- Follow your firm's quality management requirements
Full Report
Find out more about the Full Report
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others. If you would like to know more, please visit the reporting to CROSS-US page.
A correspondent is concerned about the robustness of several two storey buildings with which their design team were involved in the early 2000s. It was a stressful time with a high workload and there was pressure on the design team, some of whose members were inexperienced.
The structures generally had masonry support walls and precast floors. The architects kept pushing for thin walls, small support piers, and short or no buttressing returns. There was resistance to using steelwork over its cost. Furthermore, the architects sometimes specified floor insulation between the precast floor and the screed. This negated any membrane action the floor topping/screed could have provided.
A large internal review resulted in remedial work to a number of the buildings. However, the dreadful collapse in Miami in June 2021 of a much larger building, has reawakened the correspondent’s recurring concerns as to whether they had not done enough at the time.
The correspondent says emphasis should be placed on:
- not succumbing to cost and time pressures
- having a very thorough checking regime
- not always trusting people to follow instructions
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.
Feedback
No feedback has yet been published for this page.
Expert Panel Comments
An Expert Panel comment on the reports we receive. They use their experience to help you understand what can be learned from the reports. If you would like to know more, please visit the CROSS-US Expert Panel page.
The panel has sympathy for the reporter who has clearly been worrying about this for some time. It is reassuring to see that an internal review led to building modifications and it is hoped that this, and subsequent actions, addressed the reporter's concerns and that they are simply reporting to raise the issue so others don't have similar problems.
It was good to see that the potential risks had been identified and an internal review had been instigated. However, it should never have been allowed to get to the point where members of the organisation were so worried about the safety of a project.
The report raises wider issues because we know from feedback to the Institution of Structural Engineers (IStructE) that designers are generally uncomfortable with being able to demonstrate robustness. It is also known that some designers do not grasp the fundamental principles of stability, so there is a key message that robustness for even relatively simple structures can be problematical; indeed many of the reports to CROSS are related to such problems. There should be an overriding expectation on structural engineers to provide resilient and robust structures, irrespective of height and consequence class.
there is a key message that robustness for even relatively simple structures can be problematical
The IStructE publication Stability of Buildings is a helpful guide as to how buildings are engineered to have stability and robustness.
Design validation
This report raises the absolute need to have an experienced engineer review the design before it leaves the office and to stand up to architects, or others, who keep asking for minimum structure as opposed to sound load bearing elements. This is not uncommon, especially with inexperienced teams. Designers should always ensure that designs are properly checked and that any decisions taken that increase risk, as a result of external pressures, are justified and recorded.
There are always going to be cost and time pressures and younger engineers need to learn how to deal with them and act in accordance with their professional responsibilities to themselves, their clients, and the wider community. Some practical considerations are:
Balancing commercial pressures
Remember that whatever the commercial pressures are, if something goes wrong, the law will get involved. If injury is caused or people are exposed to unacceptable levels of risk, there may be a criminal investigation. That part of the law would focus on the duty of the designer to produce a safe design. If shown to be unsafe, the commercial pressure is no defence.
If shown to be unsafe, the commercial pressure is no defence
Designers should therefore always ensure that designs are properly checked. Where decisions are taken that increase risk as a result of external pressures these should be justified and recorded.
Finally, designers should be encouraged to seek reviews of their work by a competent person. Independent reviews are helpful not just in ensuring good practice but assisting with learning and team development. In 2009 SCOSS published a guidance paper Independent review through peer assist which set out the relevant principles and is a useful reference.