Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK [sub-heading only] (34)
- CROSS Newsletter (30)
- CROSS Safety Report (45)
- News [sub-heading only] (7)
CROSS regions
Embankment stability concerns after heavy rainfall
During the construction of a building the top edge of the steepest section of an embankment moved outwards and downwards after a period of heavy rainfall.
1 November 2005
CROSS Safety Report
Report ID: 3
Region: CROSS-UK
Local authorities and approved inspectors
A reporter is very concerned that the system of building control where there is competition between local authorities and approved inspectors, has produced a situation where the level of independent inspection has fallen dramatically.
1 July 2007
CROSS Safety Report
Report ID: 67
Region: CROSS-UK
Permanent formwork to slabs
Concerns are raised over deflection issues that are not being considered when using permanent formwork.
1 January 2011
CROSS Safety Report
Report ID: 215
Region: CROSS-UK
Defect on site deliberately covered up
A reporter shares an experience they had whilst working for a contractor as an assistant site engineer and provides evidence of the risks associated with the reliance on self-certification of construction.
1 January 2011
CROSS Safety Report
Report ID: 217
Region: CROSS-UK
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
Foundation base plates for tower cranes
On two different contracts it was observed that the foundation base plates for tower cranes had suffered from low compaction of the concrete on which they rest.
1 October 2011
CROSS Safety Report
Report ID: 257
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Collapse of a wall during construction
An internal corridor wall collapsed in a school under construction.
1 April 2008
CROSS Safety Report
Report ID: 99
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.