Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (38)
- CROSS Newsletter (15)
- CROSS Safety Report (38)
- (-) News [sub-heading only] (38)
CROSS regions
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Timber design concerns
A reporter says what he has seen of the quality of the structural engineering design of roofs in many hundreds of projects is lamentably low.
1 March 2006
CROSS Safety Report
Report ID: 21
Region: CROSS-UK
Concerns over structural design submissions
Concern was expressed about the standard of structural design submissions presented to local authorities.
1 November 2005
CROSS Safety Report
Report ID: 14
Region: CROSS-UK
Mobile phone masts
The concern of an overseas reporter is that erection, foundation design and construction, and maintenance of mobile phone masts are not carried out adequately.
1 March 2006
CROSS Safety Report
Report ID: 22
Region: CROSS-UK
Differing reinforcement couplers
On a recent project, because of supply problems, the contractor decided to change from the specified rebar couplers (type ‘A’) to those of another manufacturer (type ‘B’).
1 March 2006
CROSS Safety Report
Report ID: 28
Region: CROSS-UK
Design of timber structures
An approximate design led to a timber roof deflecting considerably.
1 November 2005
CROSS Safety Report
Report ID: 17
Region: CROSS-UK
Local authority resources to check structural calculations
An aspect of local authority work that caused concern to a reporter was the lack of internal resources to check calculations.
1 November 2005
CROSS Safety Report
Report ID: 15
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Computer aided design
Concerns are raises after it was discovered that the steel design element of a software package did not automatically allow for nominal moments in the design of columns for simple structures.
1 November 2005
CROSS Safety Report
Report ID: 10
Region: CROSS-UK
Grades of steelwork
A reporter says that engineers seem reluctant to specify the grade of steel. Even when prompted, some fail to request anything other than just S275 – failing to mention JR, J0, or other grades.
1 February 2007
CROSS Safety Report
Report ID: 43
Region: CROSS-UK