Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Locations
CROSS regions
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.