Safety information search results
Filter your results
Building or structure type
- Bridges (22)
- Buildings
(231)
- Agricultural buildings (8)
- Car parks (7)
- Commercial (19)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (13)
- Higher-risk buildings (3)
- Industrial buildings (9)
- LPS buildings (3)
- Public, religious & civic buildings (6)
- Recreational buildings (3)
- Residential (57)
- Stadiums (1)
- Storage buildings (7)
- Tall buildings (14)
- Theatres & other entertainment buildings (7)
- Transport buildings (1)
- Buried pipes & culverts (3)
- Freestanding walls (2)
- Marine structures (1)
- Masts & towers (9)
- Offshore structures (2)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (19)
- Roads (9)
- Sewers (3)
- Temporary structures (24)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (2)
- Design: quality management (42)
- Design calculations (45)
- Design conceptualisation (1)
- Design detailing (55)
- Design drawings (14)
- Design loads (67)
- Design software (18)
- Dynamics (6)
- Fire safety design (7)
- Resilience (18)
- Robustness (35)
- Structural design (72)
- Sustainability (4)
Fire incident response
Project type
- Alteration & conversion project (23)
- Assessment project [sub-heading only] (9)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (154)
- Demolition project (11)
- Excavation (12)
- Extension project (11)
- Fire safety assessment (2)
- Groundworks project (1)
- Maintenance project (1)
- New build (70)
- Refurbishment (4)
- Remediation project (11)
- Repair project (5)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Method of construction
Elements & systems
- Arch (5)
- Balconies (9)
- Balustrades (14)
- Basements (7)
- Beams (50)
- Bracing (18)
- Canopies (5)
- Ceilings (19)
- Cladding (17)
- Columns (29)
- Fasteners & connections (96)
- Fire exit doors (1)
- Fire protection (7)
- Foundations (17)
- Insulation (6)
- Light gauge steel framing (2)
- Lintels (3)
- Padstones (3)
- Parapets (7)
- Roofs (37)
- Sandwich panels (1)
- Shear walls (1)
- Signs (3)
- Slabs (28)
- Tendons (1)
- Trusses (4)
- Walls (65)
- Wall ties (7)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (14)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (7)
- CROSS-UK Newsletter 13 (5)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (8)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (7)
- CROSS-UK Newsletter 39 (7)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (6)
- CROSS-UK Newsletter 43 (6)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (7)
- CROSS-UK Newsletter 51 (8)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- (-) CROSS-UK [sub-heading only] (391)
- CROSS Newsletter (198)
- CROSS Safety Report (391)
- News [sub-heading only] (73)
CROSS regions
Design of head track in cold formed steel framing
The reporter noticed that the in-house structural engineer for the steel frame company had not taken account of all the loads in the design of the head track.
1 November 2006
CROSS Safety Report
Report ID: 39
Region: CROSS-UK
Unstable building due to modification work
A SCOTCROSS report relates to an old four storey building undergoing modifications.
1 February 2007
CROSS Safety Report
Report ID: 69
Region: CROSS-UK
CE marking scheme for structural steelwork
Concern has been expressed about the way in which the CE marking scheme for structural steelwork will be monitored, enforced and policed in the UK, since the use of CE marking is only voluntary here (but compulsory in mainland Europe).
1 April 2007
CROSS Safety Report
Report ID: 70
Region: CROSS-UK
Balustrades in public buildings
A reporter had a concern regarding a timber balustrade in a showroom.
1 February 2007
CROSS Safety Report
Report ID: 61
Region: CROSS-UK
Timber truss
The reporter has been dealing with an application where the engineer involved discovered proprietary timber girder trusses with some glued joints that have come loose.
1 February 2007
CROSS Safety Report
Report ID: 62
Region: CROSS-UK
Effective lengths of load-bearing walls
A reporter raises concerns about masonry walls that they feel do not comply with the limitations on effective length.
1 July 2007
CROSS Safety Report
Report ID: 56
Region: CROSS-UK
Adapted masonry support props
A reporter has come across adapted masonry support props in use and in their view, they must only be used in the case of limited openings where the masonry can arch over.
1 November 2006
CROSS Safety Report
Report ID: 57
Region: CROSS-UK
Possible galvanising concern
A reporter has a question about using galvanised steel poles for the members of dome structures.
1 November 2006
CROSS Safety Report
Report ID: 48
Region: CROSS-UK
Liquid metal assisted cracking
Large cracks appeared down the sides of gusset welds after a truss was erected on site.
1 November 2006
CROSS Safety Report
Report ID: 49
Region: CROSS-UK
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK