Safety information search results
Filter your results
Building or structure type
- Bridges (33)
- Buildings
(243)
- Agricultural buildings (1)
- Car parks (11)
- Commercial (20)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (9)
- Health care (3)
- Higher-risk buildings (1)
- Industrial buildings (4)
- Public, religious & civic buildings (6)
- Recreational buildings (5)
- Residential (65)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (8)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (3)
- Freestanding walls (1)
- Masts & towers (11)
- Railways (6)
- Reservoirs & dams (1)
- Retaining structures (23)
- Roads (7)
- Sewers (4)
- Temporary structures (28)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (3)
- Design: quality management (26)
- Design calculations (28)
- Design conceptualisation (11)
- Design detailing (67)
- Design drawings (24)
- Design loads (50)
- Design software (8)
- Dynamics (4)
- Fire safety design (9)
- Resilience (6)
- Robustness (22)
- Structural design (68)
- Sustainability (2)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (22)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (185)
- Demolition project (4)
- Excavation (15)
- Extension project (12)
- Groundworks project (3)
- Maintenance project (2)
- New build (104)
- Refurbishment (9)
- Remediation project (13)
- Repair project (6)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (2)
- Balconies (8)
- Balustrades (14)
- Basements (7)
- Beams (55)
- Bracing (14)
- Cables (1)
- Canopies (1)
- Ceilings (11)
- Cladding (26)
- Columns (30)
- Fasteners & connections (116)
- Fire protection (7)
- Foundations (31)
- Insulation (6)
- Light gauge steel framing (6)
- Lintels (3)
- Padstones (5)
- Parapets (5)
- PV panels (1)
- Roofs (35)
- Sandwich panels (1)
- Signs (4)
- Slabs (35)
- Tendons (1)
- Trusses (8)
- Wall head restraints (2)
- Walls (70)
- Wall ties (10)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (5)
- CROSS-AUS Newsletter 3 (4)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS Newsletter 8 (1)
- CROSS-AUS [sub-heading only] (14)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (3)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (4)
- CROSS-UK Newsletter 6 (5)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (6)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (5)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (9)
- CROSS-UK Newsletter 43 (5)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (6)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (5)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (4)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (241)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (3)
- CROSS-US Newsletter 3 (2)
- CROSS-US [sub-heading only] (6)
- CROSS Newsletter (146)
- CROSS Safety Alert (1)
- CROSS Safety Report (406)
- CROSS Topic Paper (3)
- News [sub-heading only] (47)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
- Third party article (1)
- Third party content (1)
CROSS regions
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Concern over structural engineers limited appointment
A reporter raises concerns over engineers being appointed only to provide calculations for building regulation approval.
2 February 2023
CROSS Safety Report
Report ID: 831
Region: CROSS-UK
Excessive surcharge at the back of a retaining wall
A reporter raises concerns about excessive surcharging at the top of a small retaining wall which was supporting the garden of the property.
2 February 2023
CROSS Safety Report
Report ID: 834
Region: CROSS-UK
Galvanic (bimetallic) corrosion not considered in cladding design
A cladding designer and installer did not consider galvanic (bimetallic) corrosion which led to remedial works being required.
30 June 2022
CROSS Safety Report
Report ID: 811
Region: CROSS-UK
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Production of as-constructed drawings
The reporter is concerned about who should be responsible for producing accurate “as-constructed” drawings. The reporter’s experience is that the as-constructed drawings are typically likely to be incomplete and contain errors.
14 October 2022
CROSS Safety Report
Report ID: 1056
Region: CROSS-AUS