Safety information search results
Filter your results
Building or structure type
- Bridges (1)
- Buildings
(39)
- Commercial (4)
- Education, science & art buildings (1)
- Health care (1)
- Industrial buildings (3)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (1)
- Residential (25)
- Stadiums (1)
- Tall buildings (2)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Railways (2)
- Roads (1)
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- (-) Alteration & conversion project (43)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (2)
- Construction project [sub-heading only] (41)
- Demolition project (1)
- Excavation (2)
- Extension project (11)
- Maintenance project (1)
- New build (4)
- Refurbishment (11)
- Remediation project (5)
- Repair project (3)
- Structural assessment (3)
- Underpinning project (3)
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK [sub-heading only] (23)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (13)
- CROSS Safety Report (43)
- News [sub-heading only] (2)
CROSS regions
Alterations to existing buildings with no site visits
A reporter is concerned about structural engineers developing structural calculations and drawings based on the Architects’ drawings only, with no site visits.
1 January 2014
CROSS Safety Report
Report ID: 365
Region: CROSS-UK
Brick wall removed to leave precast panels unsupported
Precast concrete slabs were left unsupported after a supporting brick wall was removed during demolition works.
1 July 2014
CROSS Safety Report
Report ID: 384
Region: CROSS-UK
Stability of terraced buildings
A reporter is concerned about a terrace of four buildings the third of which is being opened up.
1 April 2015
CROSS Safety Report
Report ID: 448
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Apparently simple home improvement work leads to dangerous situation
Apparently simple home improvement work, consisting of reroofing and a loft conversion, resulted in a 'near miss' with potentially dangerous conditions for neighbours.
21 August 2023
CROSS Safety Report
Report ID: 1173
Region: CROSS-UK
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK
Loading on balconies
A reporter wrote on behalf of a professional committee to draw attention to a concern about part of a conversion project that had come to their attention.
1 July 2007
CROSS Safety Report
Report ID: 52
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.