Safety information search results
Filter your results
Safety area
Building height
Materials
Products
Project or lifecycle stage
Design
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Fire protection to structure by cavity barriers
A reporter is concerned about a potential misconception in the construction industry regarding the role of cavity barriers and the impact their design and installation can have on the structural performance of a building.
20 November 2023
CROSS Safety Report
Report ID: 1231
Region: CROSS-UK
Non approved sealants are used with CPVC pipes and fittings
A reporter highlights a concern when non approved sealants are used with chlorinated polyvinyl chloride (CPVC) sprinkler system pipework and fittings. This can cause failures and/or leaks.
20 February 2024
CROSS Safety Report
Report ID: 1228
Region: CROSS-UK
Plastic composite fencing
A reporter is concerned about the possibility of fire spread between buildings when the external plastic composite fencing is involved in a fire.
26 August 2022
CROSS Safety Report
Report ID: 1034
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
The potential impact of scaffolding on fire safety
An issue has been raised with CROSS regarding the risk assessment process when scaffolding is present around an in-use building. It is considered that combustible scaffolding elements can potentially facilitate external fire spread, and additionally impact the performance of some of the building’s fire safety measures.
17 February 2023
CROSS Safety Report
Report ID: 1153
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Fire involving fluorescent light fitting
A fire involving a fluorescent light fitting occurred in a corridor in a sheltered housing complex.
21 August 2023
CROSS Safety Report
Report ID: 1157
Region: CROSS-UK
Apparently simple home improvement work leads to dangerous situation
Apparently simple home improvement work, consisting of reroofing and a loft conversion, resulted in a 'near miss' with potentially dangerous conditions for neighbours.
21 August 2023
CROSS Safety Report
Report ID: 1173
Region: CROSS-UK
Fire hazards in historical modular timber framed buildings
A reporter has raised fire safety concerns suggesting the potential existence of a systemic issue pertaining to the design and construction of modular timber frame systems.
20 February 2024
CROSS Safety Report
Report ID: 1243
Region: CROSS-UK
Fire protection of steelwork supporting a timber floor
A reporter shares concerns that developers and Building Control officials are assuming that, if a timber joist floor construction is suitable to provide 30 minutes fire resistance loadbearing capacity then the structural steel supporting members within it will be similarly protected.
20 February 2024
CROSS Safety Report
Report ID: 1234
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.