Safety information search results
Filter your results
Building height
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 8 (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (3)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (3)
- CROSS Safety Report (12)
- News [sub-heading only] (1)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Condition assessments of exposed lightweight canopy roofs
Defects in lightweight canopy roofs, using underslung roofing sheets in many cases.
14 October 2022
CROSS Safety Report
Report ID: 1084
Region: CROSS-AUS
Embankment stability concerns after heavy rainfall
During the construction of a building the top edge of the steepest section of an embankment moved outwards and downwards after a period of heavy rainfall.
1 November 2005
CROSS Safety Report
Report ID: 3
Region: CROSS-UK
Roof overloading
A flat roof with parapets and internal downpipes collapsed after drainage outlets became blocked.
1 November 2005
CROSS Safety Report
Report ID: 9
Region: CROSS-UK
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
School fascia board failure
A section of pressed steel gutter and plywood fascia board at a school collapsed during or after a heavy rainstorm.
1 April 2009
CROSS Safety Report
Report ID: 137
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.