Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (4)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (31)
- Demolition project (1)
- Excavation (1)
- Extension project (2)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (11)
- Refurbishment (3)
- Remediation project (4)
- Repair project (2)
- Structural assessment (6)
Method of construction
Elements & systems
- Arch (1)
- Balconies (2)
- Balustrades (2)
- Beams (6)
- Bracing (2)
- Cables (2)
- Ceilings (2)
- Cladding (3)
- Columns (4)
- Fasteners & connections (11)
- Fire protection (4)
- Foundations (1)
- Insulation (2)
- Light gauge steel framing (2)
- Parapets (1)
- PV panels (1)
- Roofs (7)
- Sandwich panels (1)
- Signs (1)
- Slabs (6)
- Tendons (2)
- Trusses (2)
- Walls (12)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 23 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 49 (4)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (5)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (54)
- CROSS Newsletter (28)
- CROSS Safety Alert (5)
- CROSS Safety Report (73)
- CROSS Topic Paper (1)
- News [sub-heading only] (14)
CROSS regions
Incorrect CE-marking of products
A reporter from Germany raises concerns about wrongly declared and/or insufficient Declaration of Performance (DoPs) for products according to the harmonized European standards with CE-marking.
1 January 2020
CROSS Safety Report
Report ID: 835
Region: CROSS-UK
Fire resistance of multi-storey car parks
A reporter visited a recently constructed car park which contained some of the same design issues discussed in the February 2018 Standing Committee on Structural Safety (SCOSS) Alert on Fire in Multi-Storey Car Parks.
1 October 2019
CROSS Safety Report
Report ID: 857
Region: CROSS-UK
Suspended ceiling partial collapse
A reporter was asked to investigate a suspended ceiling, formed from a lay-in grid, that had partially collapsed in a school classroom.
1 January 2020
CROSS Safety Report
Report ID: 854
Region: CROSS-UK
Products installed without CE-marking due to lower cost
Another report from Germany concerns products that have been delivered and installed on a construction site without any CE marking and Declaration of Performance (DoP) at all.
1 January 2020
CROSS Safety Report
Report ID: 836
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK