Safety information search results
Filter your results
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (8)
- CROSS Safety Report (37)
- News [sub-heading only] (2)
- Third party article (1)
- Third party content (1)
CROSS regions
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
CARES Alert: Unregulated reinforcement continuity systems
CARES is investigating unregulated reinforcement continuity systems entering the construction supply chain.
27 April 2021
Third party content
Publisher: CARES
Punching shear design spreadsheets
This is a technical note from a reporter about the methods their firm uses for punching shear design because there was concern about punching shear design spreadsheets possibly leading to potentially unsafe situations. .
28 March 2023
CROSS Safety Report
Report ID: 830
Region: CROSS-UK
Continuously threaded reinforcing bar
This report highlights the difficulty of inspecting continuously threaded reinforcing bars to ensure that they have been adequately inserted into the cast-in ferrules.
2 August 2022
CROSS Safety Report
Report ID: 1074
Region: CROSS-AUS
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Concrete half joints
Poor reinforcement detailing and installation in a half joint led to the collapse of a series of beams and precast concrete slabs.
1 January 2008
CROSS Safety Report
Report ID: 88
Region: CROSS-UK
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
Precast concrete planks - durability and potential safety concerns
A reporter raises concerns over the recent collapses of precast concrete floor units that are installed throughout the UK.
1 April 2007
CROSS Safety Report
Report ID: 77
Region: CROSS-UK
Culvert roof slab failure
A culvert, which carries a river under a busy main road, partially collapsed.
1 April 2008
CROSS Safety Report
Report ID: 97
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.