Safety information search results
Filter your results
Building or structure type
- Bridges (7)
- Buildings
(43)
- Agricultural buildings (1)
- Car parks (1)
- Commercial (2)
- Education, science & art buildings (4)
- Health care (1)
- Higher-risk buildings (2)
- Industrial buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (3)
- Residential (18)
- Storage buildings (1)
- Tall buildings (2)
- Theatres & other entertainment buildings (1)
- Floating structures (1)
- Marine structures (1)
- Masts & towers (3)
- Retaining structures (2)
- Temporary structures (3)
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (31)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (17)
- CROSS Safety Report (53)
- News [sub-heading only] (10)
CROSS regions
Design of head track in cold formed steel framing
The reporter noticed that the in-house structural engineer for the steel frame company had not taken account of all the loads in the design of the head track.
1 November 2006
CROSS Safety Report
Report ID: 39
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Tower crane base designs
A reporter’s firm has been involved in the design and checking of numerous tower crane bases and have come across many examples where the supplier of the tower crane has supplied incorrect loadings. These incorrect loadings could have led to crane failures had the errors not been spotted.
7 June 2022
CROSS Safety Report
Report ID: 1093
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Concern that the structural design of some recent buildings may not have been checked
A reporter has become increasingly concerned that some buildings may be structurally non-compliant for a number of reasons.
26 August 2022
CROSS Safety Report
Report ID: 1120
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK