Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (34)
- CROSS Newsletter (22)
- CROSS Safety Alert (1)
- CROSS Safety Report (56)
- CROSS Topic Paper (1)
- News [sub-heading only] (7)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Precast concrete demolition
During the demolition of a tower block, a column collapsed unexpectedly.
1 March 2006
CROSS Safety Report
Report ID: 27
Region: CROSS-UK
FC Twente stadium roof collapse
This paper concerns the collapse at the FC Twente Stadium in Holland in 2011 when part of a cantilever steel frame roof failed during erection.
1 July 2014
CROSS Topic Paper
Region: CROSS-UK
Fire compartmentation detailing issues
Two reports have been received concerning fire compartmentation detailing issues; one on the incorrect installation of fire batts and the other on the incorrect use of intumescent material.
18 August 2021
CROSS Safety Report
Report ID: 1039
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK