Safety information search results
Filter your results
Building or structure type
- Buildings
(149)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (19)
- Education, science & art buildings (13)
- Health care (13)
- Higher-risk buildings (6)
- Industrial buildings (6)
- Laboratory buildings (1)
- LPS buildings (2)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (5)
- (-) Residential (151)
- Stadiums (1)
- Tall buildings (12)
- Theatres & other entertainment buildings (3)
- Transport buildings (2)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Building height
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (25)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (61)
- Demolition project (1)
- Excavation (3)
- Extension project (14)
- Fire safety assessment (1)
- Maintenance project (2)
- New build (27)
- Refurbishment (9)
- Remediation project (10)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (4)
- Underpinning project (3)
Method of construction
Elements & systems
- Balconies (9)
- Balustrades (6)
- Basements (4)
- Beams (21)
- Bracing (5)
- Canopies (2)
- Ceilings (1)
- Cladding (7)
- Columns (10)
- Fasteners & connections (20)
- Fire protection (5)
- Foundations (6)
- Insulation (4)
- Light gauge steel framing (3)
- Lintels (3)
- Padstones (4)
- PV panels (1)
- Roofs (15)
- Shear walls (3)
- Slabs (7)
- Trusses (2)
- Wall head restraints (1)
- Walls (30)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (57)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (2)
- CROSS Feature Article (1)
- CROSS Newsletter (41)
- CROSS Safety Report (150)
- News [sub-heading only] (10)
CROSS regions
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Testing of smoke control systems
A reporter is concerned about the way that smoke control systems in residential buildings are commissioned, installed, tested, and maintained.
10 March 2022
CROSS Safety Report
Report ID: 1099
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Fire in roofs containing PV panels
A reporter is concerned about the monitoring of photovoltaic panels and whether all the possible lessons are learned from current experience.
26 August 2022
CROSS Safety Report
Report ID: 1032
Region: CROSS-UK
Fire protection of light gauge steel frames
A reporter is concerned that there is a lack of understanding regarding system testing and associated procedures, the purpose of fire assessments, and the role of materials that contribute to the structure’s fire protection.
10 December 2021
CROSS Safety Report
Report ID: 1030
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Fire protection of stair structure
A reporter is concerned about the lack of structural fire protection in a fire escape stair.
10 March 2022
CROSS Safety Report
Report ID: 1028
Region: CROSS-UK
Storm damage to pressed metal roof covering
A modern dwelling with two separate V-shaped roofs sustained damage to the standing seam pressed metal roof covering during two separate weather events.
23 February 2024
CROSS Safety Report
Report ID: 952
Region: CROSS-UK