Safety information search results
Filter your results
Building or structure type
- Bridges (12)
- Buildings
(71)
- Car parks (2)
- Commercial (11)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (6)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (4)
- Residential (17)
- Stadiums (2)
- Tall buildings (3)
- Theatres & other entertainment buildings (4)
- Transport buildings (1)
- Masts & towers (2)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (7)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (37)
- Excavation (1)
- Extension project (4)
- New build (17)
- Refurbishment (6)
- Remediation project (5)
- Repair project (1)
- Strengthening project (2)
- Structural assessment (4)
- Underpinning project (1)
Method of construction
Elements & systems
- Balconies (3)
- Balustrades (3)
- Basements (1)
- Beams (22)
- Bracing (3)
- Canopies (1)
- Ceilings (1)
- Cladding (12)
- Columns (13)
- Fasteners & connections (35)
- Fire protection (3)
- Foundations (2)
- Insulation (5)
- Light gauge steel framing (3)
- Padstones (2)
- Parapets (4)
- Roofs (11)
- Signs (1)
- Slabs (8)
- Trusses (4)
- Walls (11)
- Wall ties (2)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (38)
- CROSS-US Newsletter 1 (2)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (3)
- CROSS Newsletter (23)
- CROSS Safety Alert (1)
- CROSS Safety Report (83)
- News [sub-heading only] (6)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Provision for movement in clay brickwork facades
A reporter raises concerns over the detailing and construction of horizontal movement joints in clay brickwork facades.
2 February 2023
CROSS Safety Report
Report ID: 860
Region: CROSS-UK
Punching shear design spreadsheets
This is a technical note from a reporter about the methods their firm uses for punching shear design because there was concern about punching shear design spreadsheets possibly leading to potentially unsafe situations. .
28 March 2023
CROSS Safety Report
Report ID: 830
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Sudden failure of storage silo
A 5,000 ton capacity storage silo containing ground granulated blast-furnace slag (ggbs) split apart suddenly and without warning onsite at a concrete production facility.
14 December 2021
CROSS Safety Report
Report ID: 1045
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Gross errors fear in structural timber design
SCOSS received a report in 2002 expressing concern that standards of structural timber design achieved by many designers fall far short of those needed to give assurance of safety.
1 January 2002
CROSS Safety Alert
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.