Safety information search results
Filter your results
Building or structure type
- Bridges (3)
- Buildings
(28)
- Car parks (1)
- Commercial (2)
- Education, science & art buildings (2)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (2)
- Residential (8)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (2)
- Theatres & other entertainment buildings (1)
- Transport buildings (2)
- Masts & towers (1)
- Railways (2)
- Roads (1)
- Sewers (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Elements & systems
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 5 (4)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (11)
- CROSS-US Newsletter 3 (4)
- CROSS Newsletter (2)
- CROSS Safety Report (35)
- News [sub-heading only] (6)
CROSS regions
Major safety defects in hospital
A number of construction defects were found in a hospital following the inspection of the external wall system.
29 March 2021
CROSS Safety Report
Report ID: 826
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Embankment stability concerns after heavy rainfall
During the construction of a building the top edge of the steepest section of an embankment moved outwards and downwards after a period of heavy rainfall.
1 November 2005
CROSS Safety Report
Report ID: 3
Region: CROSS-UK
Mobile phone masts
The concern of an overseas reporter is that erection, foundation design and construction, and maintenance of mobile phone masts are not carried out adequately.
1 March 2006
CROSS Safety Report
Report ID: 22
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.