Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (9)
- CROSS Safety Report (17)
- News [sub-heading only] (1)
CROSS regions
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Specification issue with steel hollow sections
A reporter raises concerns after their structural engineer had failed to specify the steel grade used in the design for hollow sections on two projects.
30 July 2021
CROSS Safety Report
Report ID: 1006
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Possible galvanising concern
A reporter has a question about using galvanised steel poles for the members of dome structures.
1 November 2006
CROSS Safety Report
Report ID: 48
Region: CROSS-UK
Substitution of cold rolled hollow sections for hot rolled hollow sections
A reporter was advised by two of their manufacturers that their buyers have purchased cold formed hollow sections rather than the hot formed hollow section which we clearly identified in our calculations.
1 October 2009
CROSS Safety Report
Report ID: 158
Region: CROSS-UK
Freeze/thaw effects on RHSs and unexpected hydrogen generation
A reporter provides their views of the freezing effects on rectangular hollow sections (RHSs) and how this could be related to Liquid Metal Assisted Cracking.
1 October 2014
CROSS Safety Report
Report ID: 434
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Freeze and thaw of another RHS
Further to reports about the freezing of water in hollow sections a correspondent has sent photos of a section of mild steel RHS that was removed from a bridge and shows the bulging that can occur.
1 January 2015
CROSS Safety Report
Report ID: 485
Region: CROSS-UK
Contractor installs incorrect steel grade
A reporter came across an issue where the fabricator had used cold formed S235 commodity steel SHS rather than the specified hot formed S275 structural steel SHS.
1 April 2018
CROSS Safety Report
Report ID: 634
Region: CROSS-UK