Safety information search results
Filter your results
Building or structure type
- Bridges (10)
- Buildings
(75)
- Car parks (3)
- Commercial (6)
- Education, science & art buildings (6)
- Health care (1)
- Industrial buildings (1)
- LPS buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (2)
- Residential (15)
- Storage buildings (1)
- Tall buildings (1)
- Theatres & other entertainment buildings (4)
- Transport buildings (2)
- Buried pipes & culverts (2)
- Masts & towers (5)
- Railways (1)
- Retaining structures (14)
- Roads (3)
- Sewers (2)
- Temporary structures (11)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Elements & systems
- Arch (1)
- Balconies (3)
- Balustrades (3)
- Basements (1)
- Beams (14)
- Bracing (4)
- Canopies (1)
- Ceilings (13)
- Cladding (9)
- Columns (2)
- Fasteners & connections (45)
- Foundations (7)
- Padstones (2)
- Parapets (1)
- Roofs (7)
- Signs (1)
- Slabs (15)
- Tendons (1)
- Trusses (1)
- Wall head restraints (1)
- Walls (31)
- Wall ties (4)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 11 (4)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK [sub-heading only] (105)
- CROSS Newsletter (47)
- CROSS Safety Report (138)
- News [sub-heading only] (19)
CROSS regions
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Collapse of old masonry walls
There were reports of the collapse of several old masonry walls associated with adjacent construction work.
1 November 2005
CROSS Safety Report
Report ID: 12
Region: CROSS-UK
Latent shear stud defects
Shear studs appeared to be satisfactory when checked with the standard pull-over to five degrees but when hit with a hammer they snapped off.
1 November 2005
CROSS Safety Report
Report ID: 13
Region: CROSS-UK
Mobile phone masts
The concern of an overseas reporter is that erection, foundation design and construction, and maintenance of mobile phone masts are not carried out adequately.
1 March 2006
CROSS Safety Report
Report ID: 22
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Large aluminium dome failure
A structure composed of aluminium tubes failed.
1 November 2005
CROSS Safety Report
Report ID: 5
Region: CROSS-UK
Cladding fixed to stainless steel
Cladding panels fixed to a stainless steel supporting angle with stainless steel screws failed.
1 November 2005
CROSS Safety Report
Report ID: 7
Region: CROSS-UK
Items falling from buildings and structures
A reporter raises concerns about incidents on structures where items have fallen off.
1 November 2005
CROSS Safety Report
Report ID: 8
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.