Safety information search results
Filter your results
Building or structure type
- Bridges (10)
- Buildings
(35)
- Commercial (1)
- Education, science & art buildings (1)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (3)
- Residential (9)
- Storage buildings (1)
- Tall buildings (2)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Car parks (2)
- Houses (4)
- Retaining structures (1)
- Roads (1)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (4)
- Construction project [sub-heading only] (27)
- Demolition project (1)
- Extension project (1)
- Groundworks project (1)
- Maintenance project (1)
- New build (9)
- Refurbishment (4)
- Remediation project (3)
- Repair project (3)
- Strengthening project (1)
- Structural assessment (2)
Method of construction
Structural form
Elements & systems
- Balustrades (1)
- Basements (1)
- Beams (4)
- Ceilings (1)
- Cladding (10)
- Columns (5)
- Fasteners & connections (21)
- Fire protection (1)
- Foundations (6)
- Insulation (2)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (1)
- Parapets (1)
- Roofs (6)
- Sandwich panels (1)
- Slabs (4)
- Trusses (1)
- Walls (9)
- Wall ties (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
CROSS regions
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Inadequate bridge bearing pad installation
During the final construction phase of a reinforced concrete bridge deck, the contractor installed the elastomeric bridge bearing pads using a non-approved and potentially dangerous methodology.
28 March 2023
CROSS Safety Report
Report ID: 828
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Storm damage to pressed metal roof covering
A modern dwelling with two separate V-shaped roofs sustained damage to the standing seam pressed metal roof covering during two separate weather events.
23 February 2024
CROSS Safety Report
Report ID: 952
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter has learned whilst making inspections to keep quiet and pass on any comments to the site manager who can then relay the information to the subcontractors.
10 February 2023
CROSS Safety Report
Report ID: 978
Region: CROSS-UK
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Failures of cold formed steel floor systems during construction
This report describes numerous collapses during construction of cold formed steel floor systems caused by lack of bracing/fastening and overloading of an incomplete structure.
10 May 2021
CROSS Safety Report
Report ID: 997
Region: CROSS-US
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.