Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (19)
- Demolition project (1)
- Excavation (1)
- Extension project (3)
- Groundworks project (1)
- New build (6)
- Refurbishment (4)
- Remediation project (1)
- Repair project (2)
- Structural assessment (2)
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (15)
- CROSS Safety Report (32)
- CROSS Topic Paper (1)
- News [sub-heading only] (4)
CROSS regions
Temporary works design for basements
A reporter had an inquiry from a contractor who, after appointment, discovered that there was a serious lack of temporary works design information provided.
1 July 2015
CROSS Safety Report
Report ID: 423
Region: CROSS-UK
Private Building Control data protection use
A reporter needed details of a domestic extension from a local authority who said that an application had been made for the original work by a private company, but under the Data Protection Act they could not release any drawings or documentation.
6 April 2023
CROSS Safety Report
Report ID: 825
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Cladding subcontractor change of connection strategy led to failure
As part of their final design submission, a cladding subcontractor changed the connection strategy for their cladding system. The project structural engineer did not identify the design change and the cladding loading resulted in excessive deflection and some twisting of the primary perimeter steel.
21 August 2023
CROSS Safety Report
Report ID: 1189
Region: CROSS-UK
Deterioration of walkable sandwich panel ceilings
A reporter has raised concern about a complex and potentially far-reaching concern about unseen progressive deterioration in sandwich ceiling panels that have mineral wool lamella cores.
1 October 2007
CROSS Safety Report
Report ID: 54
Region: CROSS-UK
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Issues for CDM co-ordinators
A reporter feels that a lack of finance is being invested in the long-term maintenance for structures and that this is a difficult issue for the CDM co-ordinator to raise with the client.
1 January 2009
CROSS Safety Report
Report ID: 118
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.