Safety information search results
Filter your results
Safety area
Building or structure type
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
CROSS regions
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Boundary retaining wall collapse
A boundary blockwork retaining wall, with a fence on top, part collapses due to inadequate design.
30 August 2022
CROSS Safety Report
Report ID: 1119
Region: CROSS-UK
Unqualified engineer's unsafe computer aided design of a retaining wall
A chartered engineer's check found retaining walls designed by an unqualified person, who relied solely on a computer program, to be inadequate.
20 February 2024
CROSS Safety Report
Report ID: 1210
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.