Safety information search results
Filter your results
Safety area
Building or structure type
Materials
Project or lifecycle stage
Design
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (1)
- CROSS-AUS [sub-heading only] (10)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (1)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (1)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (1)
- CROSS Safety Report (47)
- Safety information [sub-heading only] (1)
CROSS regions
Object rolling into live carriageway
A disc of concrete rolled from a construction area onto a live carriageway, colliding with a passing vehicle.
6 June 2022
Report ID: 1089
Region: CROSS-UK
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Excessive deflection of spliced steel beam
A long-span primary steel beam deflects excessively at its splice during concreting of the floor slab.
30 August 2022
CROSS Safety Report
Report ID: 1111
Region: CROSS-UK
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Ineffective fire socks
A reporter shares their concern about how the quality of fire stopping in a residential project was found to be substandard and the potential reasons that led to this happening.
10 March 2022
CROSS Safety Report
Report ID: 1115
Region: CROSS-UK
Boundary retaining wall collapse
A boundary blockwork retaining wall, with a fence on top, part collapses due to inadequate design.
30 August 2022
CROSS Safety Report
Report ID: 1119
Region: CROSS-UK
Volumetric modular buildings and fire
A report has been received concerning volumetric modular construction, in the form of permanent stacked modular buildings. The reporter is concerned that the existence of extensive cavities within the compartments, combined with the lack of appropriate care when connecting the modules could lead to the concealed spread of fire and smoke, noting some recent fire events.
16 December 2021
CROSS Safety Report
Report ID: 1065
Region: CROSS-UK
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Toughened glass failures
The number of failures of heat-soaked toughened glass leads to a finding that the glass produced by some processors has not been properly heat-soaked and is therefore much more likely to shatter in use.
17 November 2022
CROSS Safety Report
Report ID: 1135
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.