Safety information search results
Filter your results
Building or structure type
- Bridges (3)
- Buildings
(18)
- Commercial (1)
- Education, science & art buildings (3)
- Health care (1)
- Industrial buildings (2)
- Laboratory buildings (1)
- LPS buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Residential (3)
- Stadiums (1)
- Tall buildings (1)
- Theatres & other entertainment buildings (1)
- Transport buildings (2)
- Freestanding walls (1)
- Railways (1)
- Retaining structures (1)
- Roads (1)
Building height
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (1)
- (-) Assessment project [sub-heading only] (21)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (3)
- Fire safety assessment (2)
- New build (1)
- Refurbishment (1)
- Remediation project (2)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (20)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (9)
- CROSS Newsletter (7)
- CROSS Safety Report (20)
- CROSS Topic Paper (1)
- News [sub-heading only] (1)
CROSS regions
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Scottish tenements
A reporter raises concerns about carrying out alterations to old tenement buildings in Scotland.
1 July 2006
CROSS Safety Report
Report ID: 26
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
PV panels blown off roof
Concerns are raised about the adequacy of fixings for PV panels after panels were blown off of a flat roof.
1 October 2015
CROSS Safety Report
Report ID: 519
Region: CROSS-UK
PV panels on domestic roof
A reporter raises concerns as they suspect PV panels are being erected on domestic (and commercial) roofs across the UK without adequate engineering analysis and design.
1 October 2015
CROSS Safety Report
Report ID: 528
Region: CROSS-UK
Installation of PV panels
A reporter's firm believes an oversaturated market of engineers carrying out assessments has drove the prices for assessments on roof structures accommodating PV panels down.
1 April 2016
CROSS Safety Report
Report ID: 533
Region: CROSS-UK
Lack of lateral stability in steel frame
Concerns were raised after the steel frame of a building was found to have a lack of horizontal and vertical bracing.
1 July 2016
CROSS Safety Report
Report ID: 540
Region: CROSS-UK
Defects in wrought iron girder from 1879
Defects were found in the strut members of a three span wrought iron girder from 1879 while major strengthening and refurbishment works were being carried out.
1 April 2016
CROSS Safety Report
Report ID: 570
Region: CROSS-UK
Defects found in previously repaired bridge
While carrying out strengthening work on a bridge, there was concern that by removing the non-structural encasement, alternative load paths had been removed.
1 April 2016
CROSS Safety Report
Report ID: 564
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.