Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- Buildings
(143)
- Agricultural buildings (4)
- Car parks (7)
- Commercial (11)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (5)
- Higher-risk buildings (1)
- Industrial buildings (3)
- LPS buildings (3)
- Public, religious & civic buildings (2)
- Residential (42)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (8)
- Theatres & other entertainment buildings (1)
- Buried pipes & culverts (1)
- Marine structures (1)
- Masts & towers (5)
- Offshore structures (1)
- Railways (5)
- Reservoirs & dams (1)
- Retaining structures (9)
- Roads (5)
- Temporary structures (19)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (2)
- Design: quality management (36)
- Design calculations (38)
- Design conceptualisation (2)
- Design detailing (38)
- Design drawings (13)
- Design loads (35)
- Design software (19)
- Dynamics (3)
- Fire safety design (5)
- Resilience (8)
- Robustness (17)
- Structural design (49)
- Sustainability (4)
Fire incident response
Project type
- Alteration & conversion project (14)
- Assessment project [sub-heading only] (8)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (98)
- Demolition project (6)
- Excavation (7)
- Extension project (10)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (45)
- Refurbishment (3)
- Remediation project (4)
- Strengthening project (6)
- Structural assessment (7)
- Underpinning project (3)
Method of construction
Elements & systems
- Arch (3)
- Balconies (4)
- Balustrades (6)
- Basements (6)
- Beams (38)
- Bracing (9)
- Cables (1)
- Canopies (2)
- Ceilings (2)
- Cladding (5)
- Columns (16)
- Fasteners & connections (48)
- Fire protection (4)
- Foundations (16)
- Insulation (1)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (1)
- Parapets (3)
- Roofs (21)
- Shear walls (1)
- Signs (2)
- Slabs (15)
- Trusses (2)
- Wall head restraints (1)
- Walls (32)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (8)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (4)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (5)
- CROSS-UK Newsletter 14 (3)
- CROSS-UK Newsletter 16 (4)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 23 (3)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (3)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (5)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (5)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (5)
- CROSS-UK Newsletter 42 (7)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (6)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (6)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (4)
- CROSS-UK Newsletter 54 (8)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (5)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (196)
- CROSS Newsletter (110)
- CROSS Safety Report (252)
- News [sub-heading only] (39)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Undermining shallow foundations
A reporter raises concerns about the tendency for existing shallow footings to be exposed and possibly undermined when adding extensions to older properties.
1 July 2010
CROSS Safety Report
Report ID: 196
Region: CROSS-UK
Insufficient design fees
A reporter raises concerns over design fees that were below typical market rates.
1 April 2010
CROSS Safety Report
Report ID: 190
Region: CROSS-UK
Unsuitable underpinning
When reviewing a consulting engineer’s proposal to underpin a party wall, the reporter noticed that there was insufficient vertical load to maintain stability under lateral load from the retained height of soil.
1 July 2010
CROSS Safety Report
Report ID: 175
Region: CROSS-UK
Issues with lifting large glazing unit
Inadequate instructions were provided by a glazing pane supplier on how to lift and move their product off of a truck and onto the works.
1 April 2016
CROSS Safety Report
Report ID: 176
Region: CROSS-UK
Collapse of Large Panel System (LPS) buildings during demolition
In 2009, numerous progressive and unexpected collapses occurred during the demolition of Large Panel System (LPS) tower blocks.
1 April 2010
CROSS Safety Report
Report ID: 186
Region: CROSS-UK
Large Panel System (LPS) building structural refurbishment issues
A reporter from a firm of consulting engineers’ comments on his experiences when refurbishing 1960s Large Panel Structure (LPS) buildings around 2000.
1 July 2011
CROSS Safety Report
Report ID: 201
Region: CROSS-UK
Role of approved inspectors
A reporter whose firm is involved in a partially built project worth £6m, where there is defective work and the builder has gone into liquidation, raises concerns over the role of the approved inspector.
1 January 2011
CROSS Safety Report
Report ID: 205
Region: CROSS-UK
Defect on site deliberately covered up
A reporter shares an experience they had whilst working for a contractor as an assistant site engineer and provides evidence of the risks associated with the reliance on self-certification of construction.
1 January 2011
CROSS Safety Report
Report ID: 217
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.