Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (8)
- CROSS Newsletter (5)
- CROSS Safety Alert (1)
- CROSS Safety Report (13)
- News [sub-heading only] (3)
CROSS regions
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Toughened glass failures
The number of failures of heat-soaked toughened glass leads to a finding that the glass produced by some processors has not been properly heat-soaked and is therefore much more likely to shatter in use.
17 November 2022
CROSS Safety Report
Report ID: 1135
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Masonry support prop adaptor
A reporter has written to say that when carrying out temporary needling and propping of openings formed in masonry walls one of the most important aspects is to ensure that the props are concentrically loaded and plumb.
1 July 2006
CROSS Safety Report
Report ID: 32
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Wrong length blind bolts lead to unsafe bridge structure
Bridge strengthening being carried out using blind bolts left a structure in an unsafe condition with traffic loading on it.
20 February 2023
CROSS Safety Report
Report ID: 1185
Region: CROSS-UK
Tension cable and rod connectors
In a number of instances, suspension fork connectors for high strength steel bars (cables or rods) acting in tension have failed at loads well below the intended design capacity or have been found to be substandard either during construction or in service.
1 August 2012
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Failure of supposedly grade 10.9 bolts
There was a high potential for collapse when supposedly grade 10.9 high strength holding bolts failed on a crane base.
1 October 2016
CROSS Safety Report
Report ID: 585
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.