Safety information search results
Filter your results
Building or structure type
- Bridges (6)
- Buildings
(66)
- Agricultural buildings (2)
- Car parks (1)
- Commercial (6)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (3)
- Higher-risk buildings (1)
- Industrial buildings (2)
- Public, religious & civic buildings (1)
- Recreational buildings (1)
- Residential (19)
- Storage buildings (2)
- Tall buildings (5)
- Theatres & other entertainment buildings (2)
- Freestanding walls (2)
- Masts & towers (2)
- Railways (1)
- Retaining structures (3)
- Roads (1)
- Temporary structures (5)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (7)
- Assessment project [sub-heading only] (6)
- Construction project [sub-heading only] (36)
- Demolition project (1)
- Excavation (2)
- Extension project (5)
- New build (27)
- Refurbishment (1)
- Remediation project (3)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (8)
Method of construction
Elements & systems
- Arch (1)
- Balconies (2)
- Balustrades (4)
- Basements (3)
- Beams (23)
- Bracing (9)
- Canopies (1)
- Ceilings (4)
- Cladding (4)
- Columns (11)
- Fasteners & connections (25)
- Fences (1)
- Fire protection (3)
- Foundations (5)
- Insulation (1)
- Light gauge steel framing (1)
- Padstones (1)
- Roofs (13)
- Slabs (8)
- Trusses (2)
- Walls (9)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (6)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (5)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (5)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (5)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (4)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (82)
- (-) CROSS Newsletter (99)
- CROSS Safety Report (99)
- News [sub-heading only] (15)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Basement excavation under a semi-detached house causes collapse
Basement excavation under a semi-detached house causes a collapse.
10 March 2022
CROSS Safety Report
Report ID: 1063
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Specification issue with steel hollow sections
A reporter raises concerns after their structural engineer had failed to specify the steel grade used in the design for hollow sections on two projects.
30 July 2021
CROSS Safety Report
Report ID: 1006
Region: CROSS-UK
Dangerous design of a retaining wall
Serious errors were made in the input to a computer program used for designing a 1.8m high retaining wall.
29 March 2021
CROSS Safety Report
Report ID: 989
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.