Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (6)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (4)
- CROSS Safety Report (14)
- News [sub-heading only] (1)
CROSS regions
Tower crane base designs
A reporter’s firm has been involved in the design and checking of numerous tower crane bases and have come across many examples where the supplier of the tower crane has supplied incorrect loadings. These incorrect loadings could have led to crane failures had the errors not been spotted.
7 June 2022
CROSS Safety Report
Report ID: 1093
Region: CROSS-UK
Tower crane bases
A reporter came across a situation in which one of the anchors into a concrete crane base appeared to be loose.
5 September 2022
CROSS Safety Report
Report ID: 973
Region: CROSS-UK
Design wind loading for tower cranes
A report from a major contractor concerns wind loading on tower cranes.
1 January 2009
CROSS Safety Report
Report ID: 132
Region: CROSS-UK
Foundation base plates for tower cranes
On two different contracts it was observed that the foundation base plates for tower cranes had suffered from low compaction of the concrete on which they rest.
1 October 2011
CROSS Safety Report
Report ID: 257
Region: CROSS-UK
Lifting an unbalanced load
This report relates to the lifting of an item of plant by a tower crane during which the load toppled from the slings causing considerable damage and delay.
1 January 2014
CROSS Safety Report
Report ID: 320
Region: CROSS-UK
Dismantling of tower cranes
The falling of two cranes during dismantling in 2019, one in the US and one in the UK, prompts reflections on crane safety on construction sites.
1 March 2020
CROSS Safety Report
Report ID: 868
Region: CROSS-US
Tower crane - failure of loadbearing part
A tower crane suffered a failure of one of its four main legs approximately 12m below the slew ring.
1 October 2014
CROSS Safety Report
Report ID: 399
Region: CROSS-UK
Crane outrigger loads underestimated due to misuse of software
A reporter is concerned about how the misuse of software can lead to incorrect outrigger loads being used in the design of foundations for crane outriggers.
1 April 2020
CROSS Safety Report
Report ID: 915
Region: CROSS-UK
Insufficient attention to the construction of tower crane bases
While working on construction sites a reporter was involved with tower crane bases supported on piles with pile caps and pedestals with cast-in anchors that had significant construction defects.
1 August 2020
CROSS Safety Report
Report ID: 920
Region: CROSS-AUS
Overloading metal decking in temporary state
During construction of steel structures with composite metal decking floors, a reporter has observed numerous occasions when the metal decking was close to being overloaded.
1 August 2020
CROSS Safety Report
Report ID: 919
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.