Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
- BIM (1)
- Computational design (4)
- Design: quality management (7)
- Design calculations (13)
- Design conceptualisation (8)
- Design detailing (12)
- Design drawings (3)
- Design loads (6)
- Design software (6)
- Dynamics (1)
- Fire safety design (3)
- Resilience (4)
- Robustness (9)
- Structural design (13)
- Sustainability (2)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (8)
- Assessment project [sub-heading only] (6)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (30)
- Excavation (1)
- Extension project (6)
- Fire safety assessment (1)
- New build (5)
- Refurbishment (5)
- Remediation project (6)
- Repair project (4)
- Structural assessment (7)
Method of construction
Elements & systems
- Arch (1)
- Balustrades (1)
- Basements (1)
- Beams (11)
- Bracing (2)
- Cables (1)
- Cladding (2)
- Columns (6)
- Fasteners & connections (9)
- Fire protection (3)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (1)
- Padstones (1)
- Parapets (1)
- Roofs (5)
- Shear walls (1)
- Signs (1)
- Slabs (5)
- Tendons (1)
- Trusses (2)
- Walls (13)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (27)
- CROSS Newsletter (11)
- CROSS Safety Report (53)
- CROSS Topic Paper (2)
- News [sub-heading only] (6)
CROSS regions
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Fire resistance of multi-storey car parks
A reporter visited a recently constructed car park which contained some of the same design issues discussed in the February 2018 Standing Committee on Structural Safety (SCOSS) Alert on Fire in Multi-Storey Car Parks.
1 October 2019
CROSS Safety Report
Report ID: 857
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK