Safety information search results
Filter your results
Materials
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Newsletter (6)
- CROSS Safety Report (29)
- News [sub-heading only] (4)
CROSS regions
Lighting pole strikes live overhead cable
An excavator operator accidentally struck a live overhead cable during the installation of a lighting pole.
1 April 2017
CROSS Safety Report
Report ID: 605
Region: CROSS-UK
Wall collapse during house demolition
A reporter describes how poor demolition practice resulted in a wall falling onto a neighbouring property.
1 April 2017
CROSS Safety Report
Report ID: 608
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Basement party walls
The client's consulting engineer had designed a new basement but, when queried by the consulting engineer for the main contractor, was unable to provide survey information for the adjoining property.
1 January 2014
CROSS Safety Report
Report ID: 361
Region: CROSS-UK
Lack of method statements on domestic projects
A reporter has observed that where an opening is being formed on domestic properties for, say a rear extension, that the builders tend to remove the masonry and follow up with the temporary propping.
1 January 2019
CROSS Safety Report
Report ID: 757
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Collapse of a reinforcing cage
The reinforcing cage to a blade pier for an overpass bridge collapsed without warning when nearing completion.
1 August 2020
CROSS Safety Report
Report ID: 941
Region: CROSS-AUS
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS