Safety information search results
Filter your results
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (9)
- CROSS Newsletter (6)
- CROSS Safety Report (30)
- News [sub-heading only] (2)
CROSS regions
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Corrosion of bridge girder beams
Severe corrosion of bridge girder beams was found during intrusive inspections.
23 May 2022
CROSS Safety Report
Report ID: 772
Region: CROSS-UK
Fatigue failure of bridge cross-girder
During a planned examination of a bridge, a cross-girder was found to have failed via fatigue.
23 May 2022
CROSS Safety Report
Report ID: 743
Region: CROSS-UK
Corrosion of main girder beam on bridge supporting rail lines
A hole was found in the central main girder on a bridge supporting rail line during inspection works.
23 May 2022
CROSS Safety Report
Report ID: 745
Region: CROSS-UK
Corrosion of steel truss footbridge
Severe corrosion was found in a steel truss footbridge during a planned examination.
23 May 2022
CROSS Safety Report
Report ID: 774
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Small bridge inspection
A student discovered corrosion on a small bridge while carrying out a survey for their final project/dissertation.
1 March 2006
CROSS Safety Report
Report ID: 23
Region: CROSS-UK
Failure of metal cladding panels on bridges
This report discusses the findings of an investigation into the causes of the failure of metal cladding panels on a bridge parapet and provides recommendations concerning the use of pop rivets to fix such panels.
23 February 2024
CROSS Safety Report
Report ID: 944
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.