Safety information search results
Filter your results
Building or structure type
- Bridges (9)
- Buildings
(78)
- Car parks (1)
- Commercial (2)
- Education, science & art buildings (9)
- Health care (1)
- Industrial buildings (4)
- Public, religious & civic buildings (5)
- Recreational buildings (3)
- Residential (27)
- Storage buildings (2)
- Tall buildings (2)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Freestanding walls (3)
- Masts & towers (1)
- Railways (3)
- Retaining structures (13)
- Roads (2)
- Temporary structures (1)
Building height
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (18)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (47)
- Demolition project (4)
- Excavation (2)
- Extension project (6)
- Maintenance project (1)
- New build (9)
- Refurbishment (6)
- Remediation project (5)
- Repair project (4)
- Strengthening project (4)
- Structural assessment (3)
Method of construction
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (2)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 20 (4)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (60)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (3)
- CROSS Newsletter (26)
- CROSS Safety Alert (2)
- CROSS Safety Report (109)
- News [sub-heading only] (11)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Scottish tenements
A reporter raises concerns about carrying out alterations to old tenement buildings in Scotland.
1 July 2006
CROSS Safety Report
Report ID: 26
Region: CROSS-UK
Collapse of old masonry walls
There were reports of the collapse of several old masonry walls associated with adjacent construction work.
1 November 2005
CROSS Safety Report
Report ID: 12
Region: CROSS-UK
Concerns over structural design submissions
Concern was expressed about the standard of structural design submissions presented to local authorities.
1 November 2005
CROSS Safety Report
Report ID: 14
Region: CROSS-UK
Design responsibility for steel to concrete connections
A reporter provides an illustrative example to support their view that the design responsibility for steel to concrete connections should be shared between the responsible designers of both materials, and that a Lead Designer should ensure all designs are properly integrated.
20 February 2024
CROSS Safety Report
Report ID: 1261
Region: CROSS-UK
Responsibility for change
The inadequate substitution of lintels led to them buckling, and the surrounding masonry cracking.
1 February 2007
CROSS Safety Report
Report ID: 50
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK