Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK [sub-heading only] (20)
- CROSS Newsletter (8)
- CROSS Safety Report (26)
- News [sub-heading only] (2)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Dangerous arches
Concerns were raised after several arches of an undercroft style structure in a conservation area were demolished, apparently without consent.
1 January 2010
CROSS Safety Report
Report ID: 153
Region: CROSS-UK
Learning from historic failures
This report is not to discuss or preempt the findings of the investigation but to draw attention to historical failures where ground conditions have been highlighted in subsequent Health and Safety Executive (HSE) reports on the incidents.
1 January 2010
CROSS Safety Report
Report ID: 154
Region: CROSS-UK
Concern about faulty self-certification of new installation
A reporter’s client had work done in a domestic property by a specialist contractor who was registered under a self-certification Competent Person’s Scheme (CPS) but the work was faulty.
1 April 2012
CROSS Safety Report
Report ID: 263
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
School roof timber truss collapse
A gym/assembly hall roof to a school collapsed suddenly and without warning overnight when fortunately the building was unoccupied.
1 January 2012
CROSS Safety Report
Report ID: 249
Region: CROSS-UK
Large Panel System (LPS) building structural refurbishment issues
A reporter from a firm of consulting engineers’ comments on his experiences when refurbishing 1960s Large Panel Structure (LPS) buildings around 2000.
1 July 2011
CROSS Safety Report
Report ID: 201
Region: CROSS-UK
Collapse of Large Panel System (LPS) buildings during demolition
In 2009, numerous progressive and unexpected collapses occurred during the demolition of Large Panel System (LPS) tower blocks.
1 April 2010
CROSS Safety Report
Report ID: 186
Region: CROSS-UK
Precast concrete canopies in housing
A reporter warns that precast concrete cantilever canopies which are slender and monolithic with lintels over entrance doorways can be vulnerable to sudden collapse.
1 January 2009
CROSS Safety Report
Report ID: 126
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.