Safety information search results
Filter your results
Building or structure type
- Bridges (8)
- (-)
Buildings
(115)
- Agricultural buildings (6)
- Car parks (5)
- Commercial (9)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (5)
- Health care (1)
- Industrial buildings (7)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (6)
- Recreational buildings (3)
- Residential (25)
- Stadiums (5)
- Storage buildings (6)
- Tall buildings (4)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Masts & towers (2)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (9)
- Assessment project [sub-heading only] (4)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (57)
- Excavation (1)
- Extension project (6)
- New build (36)
- Refurbishment (5)
- Remediation project (4)
- Repair project (3)
- Strengthening project (1)
- Structural assessment (7)
Method of construction
Elements & systems
- Balconies (7)
- Balustrades (9)
- Basements (1)
- Beams (33)
- Bracing (10)
- Cables (1)
- Canopies (2)
- Ceilings (2)
- Cladding (6)
- Columns (23)
- Fasteners & connections (46)
- Fire protection (2)
- Foundations (4)
- Insulation (2)
- Light gauge steel framing (7)
- Lintels (2)
- Padstones (4)
- Parapets (4)
- PV panels (1)
- Roofs (16)
- Shear walls (1)
- Slabs (5)
- Tendons (1)
- Trusses (3)
- Walls (10)
- Wall ties (1)
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (3)
- CROSS-UK Newsletter 23 (4)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (5)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (62)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (50)
- CROSS Safety Alert (2)
- CROSS Safety Report (112)
- CROSS Topic Paper (1)
- News [sub-heading only] (15)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Stadia crash barriers
Some hollow steel posts forming part of a crash barrier, which were only 4-5 years old, had filled with water that had caused the damage on freezing in winter.
1 February 2001
CROSS Safety Alert
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.