Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (9)
- CROSS Newsletter (8)
- CROSS Safety Report (11)
- News [sub-heading only] (1)
CROSS regions
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Dangerous balcony construction
During an investigation of a balcony construction, a reporter discovered serious inadequacies related to a total lack of coordination between sub-contract work packages coupled with a lack of appropriate supervision.
1 January 2018
CROSS Safety Report
Report ID: 694
Region: CROSS-UK
Lighting pole strikes live overhead cable
An excavator operator accidentally struck a live overhead cable during the installation of a lighting pole.
1 April 2017
CROSS Safety Report
Report ID: 605
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.