Safety information search results
Filter your results
Building or structure type
Materials
Products
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (2)
- Assessment project [sub-heading only] (8)
- Construction project [sub-heading only] (30)
- Demolition project (4)
- Excavation (5)
- Fire safety assessment (2)
- Groundworks project (1)
- New build (11)
- Refurbishment (2)
- Remediation project (2)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (10)
Method of construction
Structural form
Elements & systems
- Arch (1)
- Balconies (1)
- Balustrades (3)
- Beams (3)
- Bracing (1)
- Cladding (2)
- Columns (4)
- Fasteners & connections (9)
- Fire exit doors (2)
- Fire protection (2)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (1)
- Padstones (1)
- PV panels (1)
- Roofs (7)
- Signs (1)
- Slabs (6)
- Tendons (1)
- Trusses (1)
- Walls (6)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (29)
- CROSS Newsletter (16)
- (-) CROSS Safety Report (55)
- News [sub-heading only] (7)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Stunts on bridges cause concern
A thrill-seeker travelling up and over the arch of a bridge, risking serious injury to themselves and others, raises the concerns of a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1136
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Precast concrete demolition
During the demolition of a tower block, a column collapsed unexpectedly.
1 March 2006
CROSS Safety Report
Report ID: 27
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Fire exit chained closed due to COVID-19 concerns
A key pad operated fire exit was chained closed to prevent the spread of COVID-19.
13 August 2021
CROSS Safety Report
Report ID: 975
Region: CROSS-UK
Fire safety concern over green walls
This report discusses how building close down procedures that include isolating automated water systems might result in the drying out of green walls, thus presenting a significant fire hazard in external walls.
13 August 2021
CROSS Safety Report
Report ID: 976
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.